CAFFE VERGNANO
PROJECT: Caffe Vergnano Warehouse and production facility
CLIENT: Casa del Caffe Vergnano Spa
ARCHITECT AND SUPERVISOR OF WORKS: Arch Robert Ferroro
BUILDER: Magnetti Building
TOTAL SURFACE AREA: 15,700 m^2
BUILT SURFACE AREA: 5305m^2
Caffe
Vergnano plant has been devised with the focus on the environment
typical of the corporate policy of the Piedmont based company.The new
building is divided into two seperate but connected blocks: the first
for a semi-products and packaging warehouse, and the second for
production. The walls of the new plant are covered on the front and side
by green climbing plants which provide the background for the caffe
vergnano 1882 sign, testifying to the company's focus on
eco-sustainability in its projects. The skin of the building is made of
exposed cement in square panels, while the central block in black, the
company's corporate colour, recalling the strict geometric design
associated with caffe Vergnano's image.This "green philosophy" is
further reinforced by treatment of the water used in production
processes and reduction of waste and emissions.
ROVERE COLLI TREVEGIANI ITLAS
PROGETTO: abitazione privata e studio
LUOGO: Corvara
PROGETTO ARCHITETTIONICO: Emanuel Kostner
ANNO DI REALIZZAZIONE: 2011
Nature
and light, wood and design. these are key elements in the design for a
home and a private studio in Corvara, in the heart of the Val Badia. Colli
Trevigiani Oak wood from Itlas has been chosen for the home and studio,
using two different solutions with the same finish to infuse the home
with an elegant, warm, exclusive atmosphere.
The studio alternates the vast perspective of large wooden floorboards in response to the need for beautiful but practical flooring.
The studio alternates the vast perspective of large wooden floorboards in response to the need for beautiful but practical flooring.
METAL FOUNDATION (sLAB)
METAL FOUNDATION (sLAB)
PROJECT: Metal Foundation (sLAB)
SITUTATION: Aviles, Principado de Asturias, Spain
ARCHITECTS: [baragano], Impulso
TEAM: Ines Suarez, Veronica Carreno
COLABORATORS: Impulso, Tectum
BUILDER: Comsa, Esdehor, Tamargo, Contratas Iglesias
INSTALLATIONS: Cobra
DEVELOPERS: Fundacion Metal Asturias
BUILT SURFACE: 1.482 sqm
BUDGET: 4,000,000 Euros
COMPLETION DATE: 2011
The
concept of the structure was first conceived in the first visit and
from the memory of the place. The slab parks of the factory of
ArcelorMittal, where placed just by the site and the idea of staring to
play with this big pieces of steel is present from the first drawings
and working models. It's important to get an alive building, a building
to be lived, with walking roofs...a building that can be used much more
than only the timetable of the industrial parkwhere is placed, a new
space for Aviles. The steel structure and the installations are naked,
in order to be shown in the different course that the Foundation Metal
will teach in. Steel is the chosen material and main character on site
because the building is for Metal Foundation but also in the memory of
the place and of Aviles.